HIT Energy Services · Project case study
Commercial solar and battery storage for a UK holiday park
A practical upgrade built around the site’s existing solar PV, electrical infrastructure and changing demand—not a wholesale replacement.
Executive view
Keep the good equipment. Engineer around the constraint.
This anonymous UK holiday-park project shows how commercial solar PV and battery storage can be integrated around an existing asset. HIT assessed the site’s generation, inverter arrangement, demand and electrical infrastructure before specifying the upgrade. The result is a more flexible system designed to put locally generated energy to work for the park.
The engineering challenge
The mains connection was roughly 300 metres from the inverter house. That distance, the existing solar equipment and site demand all shaped the design. Battery storage could not sensibly be treated as an isolated product purchase.
What HIT installed and retained
The existing 20 kW solar inverter was retained. Working with the site’s 555 W PV modules and available infrastructure, the team created a purpose-built inverter house and installed a further 20 kW solar inverter. A hybrid inverter and battery storage were integrated alongside the solar installation, with the battery system able to contribute up to 30 kW subject to operating conditions.
The quoted inverter and battery ratings describe different parts of the installation; they should not simply be added together as a guaranteed simultaneous site output. Actual power available depends on solar generation, battery state of charge, inverter settings and the electrical constraints of the site.
How the solar-and-storage system helps
On a bright day, solar generation can directly support the holiday park’s load. Available energy can also charge the battery, which can then support demand at another time. The aim is to use more of the renewable generation on site and reduce avoidable grid imports where operating conditions and tariffs make that worthwhile.
Measured operation is now available for the dated periods below. The portal readings show battery energy and grid export, but do not separately meter PV generation or establish gross site load, direct solar use, avoided import or financial savings. Those require suitable metering, tariff evidence and a representative operating period.
Measured operation · updated 24 September 2026
What the monitoring actually shows
Since monitoring began on 29 June 2026, the battery has been charging and discharging while the park has continued to export electricity. These are recorded energy totals for the stated periods, not annual forecasts or financial savings.
Battery discharged
July–August 2026 · two full months
Grid export
July–August 2026 · two full months
Monthly readings · kWh
| Period | Battery charged | Battery discharged | Grid export |
|---|---|---|---|
| July 2026 | 978 | 996 | 1,625 |
| August 2026 | 896 | 926 | 1,210 |
| September 2026* | 589 | 632 | 699 |
*September is a partial month, using portal figures read on 23 September 2026. Monthly figures are rounded and should not be treated as a bill reconciliation.
Six complete days · 17–22 September 2026
A closer look at one week
Battery discharged
Battery charged
Grid export
The strongest export days were 20 and 21 September, at 89 and 71 kWh respectively. That makes further storage worth investigating against half-hourly export, charging headroom and later demand. It does not establish a battery size or a return on its own.
Project update · September 2026
Install. Monitor. Expand.
HIT has reviewed the battery operation and remaining export. The customer has ordered a further 30 kWh battery bank as the next stage of the site’s energy plan.
The additional bank has not yet been commissioned and is not included in the measured results above. Its charging, discharge and any financial benefit will be assessed after installation.
Why HIT starts with the existing solar asset
Replacing working equipment merely because it is older can waste value. HIT Energy Guard and our engineering review help establish whether the PV is generating as expected, whether inverters and electrical infrastructure remain suitable, how the site consumes power and when surplus generation is exported. The right next step may be maintenance, targeted repowering, more PV, battery storage—or a combination.
For compatible installations, HIT Energy Guard Battery Management can bring solar performance, site demand, battery operation, forecasts and electricity tariffs into the same decision process. The aim is to determine when to charge, hold or discharge, subject to site-specific integration and control settings. This capability is being developed; the case study does not claim that predictive control or a particular savings outcome is already active at this holiday park.
The HIT approach
Monitor. Understand. Build on what works.
Commercial solar O&M, battery integration and ongoing energy management belong in one plan—not three disconnected projects.
Commercial solar battery storage: common questions
Can a business add battery storage to existing solar PV?
Often, yes. HIT checks the solar asset, inverter arrangement, site demand, import and export, and electrical constraints before recommending whether a standalone or hybrid battery arrangement is suitable.
Does the existing inverter need replacing?
Not automatically. In this project, the original 20 kW inverter was retained. Any decision to retain, repair or replace equipment should follow condition and compatibility checks.
What determines commercial battery size?
Battery capacity and power should be sized against half-hourly demand, solar generation and export, operating hours, tariffs, desired resilience and the site’s connection and inverter limits. A larger battery is not automatically a better investment.
Can the battery reduce grid imports?
It can store available surplus generation for later use, subject to the system design and site demand. Verified savings require actual metering, tariff and operating data—not an assumption based on equipment ratings alone.